Albina provided 109,000# of bent steel for the Eli Lilly San Diego Biotech Center in La Jolla, CA. Eli Lilly doubled the size of its research facility to 300,000 square feet during this project. Materials included: 8″ X 8″ X 5/8″ ANGLE A36- half of the parts rolled leg in and half of the parts rolled leg out. Tube Steel 8″ X 8″ X .500″ WALL A500 GR B 8 5/8″ OD X .625″ WALL A500B Wide Flange W16 X 57# A992- Split into WT8 and rolled some parts stem in and rolled some parts stem out. Wide Flange W24 X 103# A992- DOUBLE split to a finished height of 8¼” tall. Albina then rolled some parts stem in and other stem out.